Browsing German translation

Don't show this notice anymore
Before translating, be sure to go through Ubuntu Translators instructions and German guidelines.
359368 of 726 results
359.
Check to see if CONFIG_NO_HZ is set in the kernel (this is just a simple regression check)
description
Überprüfen, ob »CONFIG_NO_HZ« im Kernel gesetzt ist (Dies ist nur ein einfacher Regressionstest).
Translated and reviewed by Carsten Gerlach
Located in ../jobs/power-management.txt.in:145
360.
PURPOSE:
This test will ensure that the AC is unplugged for the battery drain tests to run.
STEPS:
1. Unplug laptop from AC.
VERIFICATION:
Was the laptop unplugged from AC?
description
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
ZWECK:
Dieser Test stellt sicher, dass das Stromkabel nicht angeschlossen ist, um den Akkuleerlauftest ausführen zu können.
DURCHFÜHRUNG:
1. Trennen Sie den Laptop von der Stromversorgung.
ÜBERPRÜFUNG:
Wurde der Laptop von der Stromversorgung getrennt?
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:151
361.
Checks the battery drain during idle. Reports time until empty
description
Den Akkuverbrauch im Leerlauf überprüfen. Messen der Zeit, bis der Akku leer ist.
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:163
362.
and capacity as well.
description
und auch der Kapazität.
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:163
363.
Checks the battery drain while watching a movie. Reports time
description
Den Akkuverbrauch überprüfen, während Sie einen Film anschauen. Bestimmen der Laufzeit
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:173
364.
until empty and capacity as well. Requires MOVIE_VAR to be set.
description
bis zum vollständigen Entladen und auch die Kapazität. »MOVIE_VAR« muss gesetzt sein.
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:173
365.
Checks the battery drain during suspend. Reports time until
description
Überprüft die Entladung der Batterie während der Bereitschaft. Zeigt die Zeit bis
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:185
366.
empty and capacity as well.
description
zum vollständigen Entladen und auch die Kapazität.
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:185
367.
PURPOSE:
This test will ensure that the AC is plugged back in after the battery.
tests
STEPS:
1. Plug laptop into AC.
VERIFICATION:
Was the laptop plugged into AC?
description
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
ZWECK:
Dieser Test stellt sicher, dass der Laptop nach Ausführung der Akkutests wieder mit dem Stromnetz verbunden wird.
DURCHFÜHRUNG:
1. Schließen Sie den Laptop an das Stromnetz an.
ÜBERPRÜFUNG:
Wurde der Laptop ans Stromnetz angeschlossen?
Translated and reviewed by Hendrik Schrieber
Located in ../jobs/power-management.txt.in:193
368.
PURPOSE:
This test will verify that your system can successfully reboot.
STEPS:
1. Select 'Test' to initiate a system reboot.
2. When the grub boot menu is displayed, boot into Ubuntu (Or allow the
system to automatically boot on its own).
3. Once the system has restarted, log in and restart checkbox-certification-server.
4. Select 'Re-Run' to return to this test.
5. Select 'Yes' to indicate the test has passed if the system rebooted
successfully, otherwise, select 'No' to indicate there was a problem.
VERIFICATION:
Did the system reboot correctly?
description
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
ZWECK:
Dieser Test überprüft, ob Ihr System erfolgreich neu starten kann.
DURCHFÜHRUNG:
1. Klicken Sie auf »Testen«, um einen Neustart des Rechners zu veranlassen.
2. Wenn das Grub-Boot-Menü erscheint, wählen Sie Ubuntu (oder lassen Sie das Standardsystem starten).
3. Melden Sie sich nach dem Neustart an und starten Sie »checkbox-certification-server« neu.
4. Wählen Sie »Wiederholen« um diesen Test erneut zu starten.
5. Wählen Sie »Ja«, wenn der Rechner erfolgreich neu gestartet ist, ansonsten wählen Sie »Nein«.
ÜBERPRÜFUNG:
Wurde der Rechner erfolgreich neu gestartet?
Translated and reviewed by Carsten Gerlach
Located in ../jobs/power-management.txt.in:206
359368 of 726 results

This translation is managed by Ubuntu German Translators, assigned by Ubuntu Translators.

You are not logged in. Please log in to work on translations.

Contributors to this translation: Abel Deuring, Andre Jungmann, Björn Ternes, Carsten Gerlach, Christian Heitjan, Christian Schulz, Christoph Klotz, Daniel, Daniel Manrique, Daniel Schury, Daniel Winzen, Denise Tiersch, Dennis Baudys, Dikay, Ettore Atalan, Felix, Finn Thieme, Frank Sagner, Georg Haunschild, Gerald App, Gerjet Kleine-Weischede, Ghenrik, Hagen von Eitzen, Helene, Hendrik Schrieber, Henry Wünsche, Ingo Schwandt, Jan Simon, Jochen Skulj, Jochen.Hanebuth, Joel Garske, Jonas Platte, Julian, Lothar Serra Mari, Lunix, MaraLS, Marc Legris, Marco Eggersmann, Mario Blättermann, Mark Mahler, Martin Lettner, Martin Weil, Mathias Schenner, Maximilian Müller, Michael Stempin, Moritz Baumann, Patrick Stratil, Paul Guezelkuecuek, Phillip "ZyanKLee" Stockmann, Phillip Sz, Robert Kurz, Robin Gloster, Ronald Müller, Salesome, Samuel, Sascha, Spencer Young, Steven Beer, Torino, William Glover, mrx5682, rm, schuko24, theghost, tlue, u2ix, uellue.