Browsing Chinese (Simplified) translation

1072 of 1482 results
1072.
Prerequisites: other tasks that need to be completed before
a task can be started. The task remains inactive until the last prerequisite task is
completed. Note that if the task has a specific planned start date set, that
date has to be in the past <em>and</em> all prerequisite tasks need to be
completed before the task becomes late.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
前提条件:启动任务前,必须要先完成的其他任务
在先决任务完成前,该任务的状态将维持在”不活跃"
请注意,如果该任务被设定了一个特定的计划开始日期,那么
这个日期必须在过去,<em>且</em>所有先决任务都必须在该任务变迟之前完成。
Translated and reviewed by Eric Xu
Located in taskcoachlib/help/__init__.py:186
1072 of 1482 results

No translation group has been assigned.

You are not logged in. Please log in to work on translations.