Planned start date: the first date on which the task can be started.
The planned start date defaults to the date the task is created. It can also be 'None'
indicating that you don't really want to start this task. This can be convenient
for e.g. registering sick leave.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
“计划开始日期”:任务可以开始的第一天。
计划开始日期默认为任务创建的日期。也可以是'无'
表示您并不真想启动此任务。这对登记病假等来说,非常方便。