Browsing German translation

10611070 of 1482 results
1061.
Using templates
Vorlagen benutzen
Translated by Frank Niessink
Located in taskcoachlib/help/__init__.py:150 taskcoachlib/help/__init__.py:736
1062.
Graphical user interface
Grafische Benutzerschnittstelle
Translated and reviewed by Frank Niessink
Located in taskcoachlib/help/__init__.py:152 taskcoachlib/help/__init__.py:771
1063.
Keyboard shortcuts
Tastenkürzel
Translated and reviewed by Frank Niessink
Located in taskcoachlib/help/__init__.py:154 taskcoachlib/help/__init__.py:793
1064.
Tasks are the basic objects that you manipulate. Tasks can
represent anything from a single little thing you have to do to a complete
project consisting of different phases and numerous activities.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
Aufgaben sind die Basisobjekte, die Sie bearbeiten. Aufgaben können
alles repräsentieren, angefangen von einer Kleinigkeit bis zum
komplette Projekt mit verschiedenen Phasen und zahlreichen Aktivitäten.
Translated by Frank Niessink
Located in taskcoachlib/help/__init__.py:163
1065.
Tasks have the following properties you can change:
Aufgaben haben die folgenden Eigenschaften, die Sie ändern können:
Translated by Frank Niessink
Located in taskcoachlib/help/__init__.py:169
1066.
Subject: a single line that summarizes the task.
Betreff: eine Zeile, welche die Aufgabe zusammenfasst
Translated by Frank Niessink
Located in taskcoachlib/help/__init__.py:171
1067.
Description: a multi-line description of the task.
Beschreibung: über mehrere Zeilen gehende Beschreibung der Aufgabe
Translated by Frank Niessink
Located in taskcoachlib/help/__init__.py:172
1068.
Planned start date: the first date on which the task can be started.
The planned start date defaults to the date the task is created. It can also be 'None'
indicating that you don't really want to start this task. This can be convenient
for e.g. registering sick leave.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
Geplantes Startdatum: Datum, ab welchem die Aufgabe begonnen werden kann.
Das geplante Startdatum ist standartmäßig das Datum, an dem die Aufgabe erstellt wurde. Es muss nicht festgelegt werden, woraus resultiert, dass die Aufgabe nicht wirklich gestartet werden soll. Dies kann nützlich sein, um z.B. Krankenstände zu erfassen.
Translated and reviewed by toomuch
Located in taskcoachlib/help/__init__.py:173
1069.
Due date: the date the task should be finished.
This can be 'None' indicating that this task has no fixed due date.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
Fälligkeitsdatum: Datum, wann die Aufgabe erledigt sein sollte.
Es kann 'Keines' sein, um anzuzeigen, dass diese Aufgabe kein festes Fälligkeitsdatum hat.
Translated and reviewed by KaSaMaDa
Located in taskcoachlib/help/__init__.py:177
1070.
Actual start date: the date the task was actually started.
The actual start date can be edited directly, but it is also set when you
track effort for the task or when you set the percentage completed of a task
to a value between 0% and 100%.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
Tatsächliches Startdatum: Datum, an dem die Aufgabe tatsächlich begonnen wurde.
Das tatsächliches Startdatum kann direkt gesetzt werden, es wird jedoch automatisch gesetzt, wenn Aufwende für Aufgaben erfasst werden oder wenn der Fertigstellungsgrad (0-100%) geändert wird.
Translated and reviewed by toomuch
Located in taskcoachlib/help/__init__.py:179
10611070 of 1482 results

No translation group has been assigned.

You are not logged in. Please log in to work on translations.

Contributors to this translation: Benjamin Wilde, Bernd Zuell, Daniel Winzen, Dennis Baudys, Dirk Drexlin, Ernst Mair, Etienne Ruedin, Frank Niessink, Gerjet Kleine-Weischede, Hannes Fritz, Hauke, Jochen Hoffmann, Jérôme Laheurte, KaSaMaDa, Kurt Ludikovsky, Ltdeta, Marc Schneider, MatK, Mathias Richerzhagen, Mechtilde, Peter Sommer, Samuel Suther, Sascha Holzhauer, Thomas Reindlmeier, Tim Schulze-Hartung, Tom K., Winfried Mueller, mondstern, schulz3000, tom vital, toomuch, wollebaer.