Browsing Czech translation

255 of 291 results
255.
The end date must be after the start date.
Konečné datum musí být po počátečním.
Translated and reviewed by Zbyněk Schwarz
Located in [http://bazaar.launchpad.net/~intrahealth+informatics/ihris-qualify/4.0-dev/annotate/head%3A/configs/en_US/iHRIS-Qualify-Configuration.xml#L20 ihris-qualify/4.0-dev/annotate/head%3A/configs/en_US/iHRIS-Qualify-Configuration.xml line 20] [http://bazaar.launchpad.net/~intrahealth+informatics/ihris-qualify/4.0-dev/annotate/head%3A/configs/en_US/iHRIS-Qualify-Configuration.xml#L41 ihris-qualify/4.0-dev/annotate/head%3A/configs/en_US/iHRIS-Qualify-Configuration.xml line 41]
255 of 291 results

No translation group has been assigned.

You are not logged in. Please log in to work on translations.